Bremen Engineering Desk — Open for Q4 2026 builds
Response SLA: < 2 hours
Vol. 04 · Appendix

The legal booklet —
read it like a zine.

Publisher of record: BridgeCodeSys, Vohnenstraße 93, 28201 Bremen, Germany · [email protected]
Last revised: 1 October 2026

I. Privacy Policy

GDPR · Reg. (EU) 2016/679

BridgeCodeSys (“we”, “us”) is the data controller for personal data processed through bridgecodesys.com and our project engagements. Our registered studio is Vohnenstraße 93, 28201 Bremen, Germany. Privacy questions may be sent to [email protected].

What we collect. When you submit the contact questionnaire, email us, or call the studio, we process your name, email address, phone number (if provided), company affiliation, budget band, and the contents of your project brief. Payment transactions are handled by Stripe; we never see or store full card numbers.

Why we process it. Under Article 6(1)(b) GDPR, data is processed to answer your inquiry and, if a contract follows, to deliver and invoice the engagement. We also process limited analytics under Article 6(1)(f) — our legitimate interest in keeping the site fast and reliable — which you can decline via the cookie banner.

Retention. Inquiry correspondence is retained for 24 months. Contractual and invoice records are kept for 10 years, as required by German commercial and tax law (§147 AO, §257 HGB).

Recipients & transfers. Data is processed on EU-hosted infrastructure. We use vetted processors (email hosting, Stripe payments, uptime monitoring) bound by Article 28 processing agreements. We do not sell personal data and do not run third-party advertising trackers.

Your rights. You have the right of access, rectification, erasure, restriction, portability, and objection (Articles 15–21 GDPR). Write to [email protected]; we respond within 30 days. You may also lodge a complaint with a supervisory authority — for us, the Die Landesbeauftragte für Datenschutz und Informationsfreiheit Bremen.

II. Terms of Service

Service agreement framework

These Terms govern engagements between BridgeCodeSys, Vohnenstraße 93, 28201 Bremen, Germany, and the client named in the accompanying statement of work (SOW). The SOW, these Terms, and the quoted scope form the complete agreement; conflicting client purchase terms do not apply unless we accept them in writing.

Scope & changes. Work begins after written acceptance of an SOW and receipt of the agreed deposit. Scope changes are handled through a written change note with adjusted fee and timeline; we never silently absorb or invent scope.

Fees & payment. Prices are quoted in EUR excluding VAT where applicable. Deposits are due before work starts; remaining balances on milestone delivery, payable within 14 days of invoice unless the SOW states otherwise. Online invoices can be settled through our Stripe payment link. Late payments accrue statutory default interest (§288 BGB) plus a €40 flat recovery fee for consumers.

Delivery & cooperation. Timelines depend on timely client feedback, access credentials, and content. Delays in client input extend delivery day-for-day. Acceptance is presumed 10 business days after delivery if no material defects are reported in writing.

Intellectual property. Upon full payment, all rights in the client-specific deliverables — source code, designs, and documentation — transfer to the client. BridgeCodeSys retains rights to pre-existing libraries, tooling, and generic know-how, which are perpetually licensed to the client as needed to use the deliverables.

Warranty & liability. We warrant that deliverables materially match the agreed SOW for 90 days after acceptance; defect fixes are free during that window. We are liable without limitation for intent, gross negligence, injury to life/body, and under the Product Liability Act. For ordinary negligence, liability is limited to foreseeable, contract-typical damage — for digital services, capped at the respective SOW fee. Statutory consumer rights are unaffected.

Termination. Either party may terminate for cause with written notice if the other breaches a material obligation and fails to cure within 14 days. On termination, completed milestones remain payable and deliverables transfer only once paid in full. Governing law: Federal Republic of Germany; place of jurisdiction is Bremen, so far as legally permissible.

III. Cookie Policy

How this site uses storage

Cookies are small text files placed on your device when you visit a website. BridgeCodeSys keeps cookie usage deliberately minimal: no advertising networks, no cross-site profiling, no data brokers.

Strictly necessary storage. When you press “Accept” on the cookie banner, we store a single local-storage flag (cookie_accepted) in your browser so the banner does not reappear. This flag never leaves your device and is cleared if you wipe site data.

Functional cookies. Session cookies may be set to keep forms and secure areas stable during a visit. These expire when you close the browser and are required to operate the site.

Embedded content. Our contact page embeds a Google Map. Google may set technical cookies when that iframe loads; map interaction is optional and not required to submit the contact form. Google's handling of data is governed by Google's own policies.

Analytics. If privacy-respecting aggregate analytics are enabled, they run without cross-site identifiers. You can refuse non-essential cookies via the banner — the site remains fully usable either way.

Managing cookies. You can delete stored cookies or block them entirely in your browser settings. Blocking strictly necessary storage may prevent the site from remembering your cookie choice. Questions? Write to [email protected].

IV. Refund & Reimbursement Policy

Deposits · milestones · retainers

We sell engineering time and deliverables, not shelf goods — so refunds follow the work completed, not a 30-day window. This policy explains exactly how money moves if an engagement ends early.

Deposits. The initial deposit reserves your slot on the engineering calendar and covers discovery and setup. If you cancel before any milestone work has begun, the deposit is refundable less any hours already worked at the SOW day-rate. If we cancel for reasons within our control, the deposit is refunded in full within 14 days.

Milestone work. Completed milestones are non-refundable — the work has been delivered and accepted. For work in progress when an engagement ends, we refund the unearned portion of any prepaid milestone fee, prorated against documented hours, within 14 days of termination.

Monthly retainers. The Priority Engineering Retainer bills monthly in advance and can be cancelled any time before the next renewal date; the current month remains payable and is non-refundable once the retainer window has opened. Unused response hours do not roll over beyond one billing cycle.

Defects. If a delivered milestone materially deviates from the SOW and we cannot cure the defect within a reasonable period, you may demand a fee reduction or terminate that portion of the engagement; amounts paid for the defective milestone will be refunded or credited as agreed.

Statutory rights. Consumers retain statutory withdrawal rights where they apply to remote service contracts (§355 BGB); any such withdrawal request must be sent in writing to [email protected] or BridgeCodeSys, Vohnenstraße 93, 28201 Bremen, Germany. Refunds are issued to the original payment method; Stripe payment-link charges are returned through the same channel.